Step-specific public work status for 105-4 under J01-105. This page groups the closing evidence so unblocking J01-9 can be checked, not merely claimed.

Goal

  • The relevant test runs for the app repo and the lib are collected visibly.
  • The local integration test against the local lib checkout is traceable.
  • J01-9 is unblocked only when J01-105 is proven complete in both domain and technical terms.

Report

  • J01-105 is visible in the active sprint as sprint-support because it blocks J01-9.
  • Closing this issue depends on consistent evidence across multiple repos, not on one isolated file change.
  • This step therefore records the closing criteria and the evidence location separately.

Current status

  • Jira subtask J01-124 exists.
  • The verification and unblocking logic is separated as its own public step.
  • Concrete test runs and the final Jira transition are still open.

Verification plan

Check Expectation Evidence / Location Status
App tests green Target model runs reproducibly in the main repo app repo, test run open
Lib tests green Expander and validation are covered against the target model lib repo, test run open
Integration test traceable Main repo tests against the local lib checkout set-config-spec-repo, work note open
J01-9 unblocked Jira shows no remaining blocker via J01-105 Jira open

Open points

  • Freeze the minimum test set required for closure.
  • Check whether follow-up references to J01-37 or J01-31 must be carried into the final closing picture.