J01-72 Atlassian-System vorbereiten (SSOT: Jira) – Iteration 1: Umsetzungsschritte
Type
Task
Status
Erledigt
Priority
Medium
Assignee
Dani Y.
Sprint
-
Sprint role
Sprint-Admin
Resolution
Fertig
Updated
2026-03-20T12:36:15.511+0100
Parent
J01-84

Contents key

This page

Public steps

Canonical public work status for J01-72. This issue groups the implementation steps for the Jira-SSOT track and records the public closure state of the parent issue.

Goal

Close the implementation steps under J01-72 so that Jira, public work docs, and the public Jira area all carry the same end state and no hidden subtasks remain open.

Closure picture

  • The historical implementation steps under J01-72 are either done or closed as explicit public review/decision work.
  • J01-83 delivers the first actively used cache V1 together with its public work doc.
  • J01-73 no longer lingers as a silent leftover; it is publicly closed through ADR-0003 and the related operations path.

Verification plan

Check Expectation Evidence / Location Status
Subtasks no longer hide an open leftover All subtasks under J01-72 are done or publicly documented as replaced review/decision work Jira subtask list for J01-72 and J01-73 done
Cache track is publicly closable J01-83 has a work doc, verification plan, and canonical Jira link J01-83 done
Parent can be traced from Jira to public docs directly Jira holds a remote link to /en/jira/issues/J01-72/ Jira remote links for J01-72 done
Public Jira page shows the same closure state /en/jira/issues/J01-72/ no longer lists open subtasks and carries the done status Jira: J01-72 done

Closure

J01-73 and J01-83 are both Done in Jira, and the public Jira area reflects the same state. That also closes J01-72 as the parent issue.